• en  English
    • hr Hrvatski (Croatian)
    • fr Français (French)
    • de Deutsch (German)
    • bg Bulgarian
    • ro Română (Romanian)
    • sl Slovenian
Mediation, design, consulting and research in the field of wastewater and air treatment ATT&AT d.o.o.
BP GROUP d.o.o.BP GROUP d.o.o.BP GROUP d.o.o.BP GROUP d.o.o.
  • PRODUCTS
    • Production program 1
      • Swimming Pools and Pool Technique
      • Waterproof Collecting Tanks
      • Wastewater Treatment Plants
      • Tele-Supervising Control
      • UV Disinfection and Chemical Treatment
      • Composting
      • Polyelectrolyte preparation unit
    • Production program 2
      • Light Liquids Separators
      • Securing Devices
      • Drainage Channels
      • Manholes
      • Nidaplast
      • Rain Water Collecting Plants
      • Carwash Stations
    • Production program 3
      • Tanks
      • Pontoons
      • Pontoon house
      • Lagoons
      • Air Treatment
      • Treatment of Industrial Water
      • Filter Bags
  • PROJECTS
    • Treatment of Industrial Water
      • Fish industry – plant for processing sea fish
      • Dairy industry – milk processing plant
  • NEWS
  • TECHNICAL SUPPORT
    • QUUESTIONNAIRES
    • REFERENCE LIST
  • ABOUT US
  • CONTACT

Embedding in grass area and roadway

    Home Embedding in grass area and roadway

    Installation of the unit with square cross section – type ER (embedding in road way, high level of subsoil water)

    The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 20cm from the border of unit) Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy ± 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling with concrete. Filling with water and filling back with the concrete must be carried out concurrently until top of the tank. On the top of the unit is necessary to concrete foundation board in accordance with the load.

    
    
    		

    Instalation of the unit with square cross section – type P (embedding to the grass area)

    The pit must be excavated with corresponding ground dimensions and a concrete foundation board must be prepared (min. 40cm from the border of unit). Settling of the separator consists of its placing on the flat concrete foundation board with an accuracy ± 5 mm (min. 25 cm of thickness), connecting to inlet and outlet pipes, filling the water into the unit 30 cm high and back filling the soil works. Filling with water and filling back the soil works must be carried out concurrently until top of the tank.

    This is only a general proposal of installation . Mounting andsizing must be carried out in accordance with the situation on the ground and rules of the profession.

    CONTACT US FOR MORE INFORMATION!

    PRODUCTS

    • Swimming Pools and Pool Technique
    • Waterproof Collecting Tanks
    • Wastewater Treatment Plants
    • Tele-Supervising Control
    • UV Disinfection and Chemical Treatment
    • Composting
    • Light Liquids Separators
    • Securing Devices
    • Manholes
    • Drainage Channels
    • Rain Water Collecting Plants
    • Filter Bags
    • Tanks
    • Pontoons
    • Pontoon house
    • Lagoons
    • Air Treatment
    • Treatment of Industrial Water
    • Polyelectrolyte preparation unit
    • Carwash Stations

    BP GROUP d.o.o.

    Glavna 2 | 31309 Kneževi Vinogradi
    Hrvatska
    Tel : +385 31/730-881
    E-Mail: bp-group@bp-group.hr
    EORI/PIB: HR29676373000

    Accounts:

    Hypo Alpe Adria Bank d.d. Zagreb
    IBAN: HR5025000091102043902

    Zagrebačka banka d.d., Zagreb
    IBAN: HR1023600001102347281
    SWIFT: ZABAHR2X

    *** BP Group is not responsible for any possible errors in the text

    Privacy Policy

    PARTNERS FOR 3D DESIGN

    W3Schools

    Latest News

    • Our colleagues took part in the CROVIK 2025 professional conference.

      From 7 to 11 October 2025, the traditional annual professional conference “CROVIK – Current Topics in Water Supply and Wastewater Management” is being held in Vodice, organized by the Croatian Water and Sewerage Association

      10 October, 2025
    • EXPO 2025 – Osaka/Japan

      BP Group d.o.o. is participating in the Economic Forum “Croatia – Japan,”

      22 September, 2025
    • We participated in the 3rd European Green Conference!

      We had the honor of presenting our project “AI as Support for a Clean Future”, where artificial intelligence serves as technical assistance for our users, helping them implement greener and more efficient solutions.

      17 June, 2025

    BP GROUP

    CROATIA

    BP GROUP d.o.o.
    Glavna 2, Kneževi Vinogradi
    Tel: +385 31/730-881
    E-mail: bp-group@bp-group.hr

    SERBIA

    Borplastikaeko d.o.o.
    Čerevićka 46D/2, Novi Sad
    Tel: +381 21/6312-299
    E-Mail: office@borplastikaeko.rs

    BOSNIA AND HERZEGOVINA

    Borplastikaeko d.o.o.
    Kralja Tvrtka Prvog br. 2, Tuzla
    Tel: +387 35/279-122
    E-Mail: office@borplastikaeko.ba

    MONTENEGRO

    Borplastikaeko d.o.o.
    Kozaračka 21a, 81000, Podgorica
    Tel: +382 20/240 780
    E-Mail: direktor@borplastikaeko.me

    NEW ZEALAND

    111 View Rd | Sunnyvale
    Auckland 0612
    Tel : +64 21/1931-777
    E-Mail: info@bor-plastika.co.nz

    HUNGARY

    Bolygó utca 18, Pécs
    Tel: +36 72/891-363
    E-mail: office@bor-plastika.eu

    MACEDONIA

    EHI dooel
    3 Makedonska brigada bb , Skopje
    Tel : +389 22/460-075
    E-Mail: contact@ehi.com.mk

    ALBANIA

    Rr. Kodra e Diellit. Nr. 3
    Selitë, Farkë, Tirana 1001-1054
    Mob: +355 69 392 2388
    E-Mail: office@borplastikaeko.al

    Strategic partners


    W3Schools


    W3Schools


    W3Schools


    W3Schools

    • News
    • Technical Support
    • REFERENCE LIST
    • About Us
    • Contact
    Copyright 2022 BP GROUP d.o.o. | All Rights Reserved
    • PRODUCTS
      • Production program 1
        • Swimming Pools and Pool Technique
        • Waterproof Collecting Tanks
        • Wastewater Treatment Plants
        • Tele-Supervising Control
        • UV Disinfection and Chemical Treatment
        • Composting
        • Polyelectrolyte preparation unit
      • Production program 2
        • Light Liquids Separators
        • Securing Devices
        • Drainage Channels
        • Manholes
        • Nidaplast
        • Rain Water Collecting Plants
        • Carwash Stations
      • Production program 3
        • Tanks
        • Pontoons
        • Pontoon house
        • Lagoons
        • Air Treatment
        • Treatment of Industrial Water
        • Filter Bags
    • PROJECTS
      • Treatment of Industrial Water
        • Fish industry – plant for processing sea fish
        • Dairy industry – milk processing plant
    • NEWS
    • TECHNICAL SUPPORT
      • QUUESTIONNAIRES
      • REFERENCE LIST
    • ABOUT US
    • CONTACT
    • en  English
      • hr Hrvatski (Croatian)
      • fr Français (French)
      • de Deutsch (German)
      • bg Bulgarian
      • ro Română (Romanian)
      • sl Slovenian
    BP GROUP d.o.o.